Answer : Option BExplaination / Solution:
The graph in option (A) has a 3 length cycle whereas the original graph does not have a 3
length cycle
The graph in option (C) has vertex with degree 3 whereas the original graph does not have a
vertex with degree 3
The graph in option (D) has a 4 length cycle whereas the original graph does not have a 4
length cycle
Q2.An automobile plant contracted to buy shock absorbers from two suppliers X and Y. X supplies
60% and Y supplies 40% of the shock absorbers. All shock absorbers are subjected to a quality test.
The ones that pass the quality test are considered reliable Of X's shock absorbers, 96% are reliable.
Of Y's shock absorbers, 72% are reliable.
The probability that a randomly chosen shock absorber, which is found to be reliable, is made by
Y is
Q3.A political party orders an arch for the entrance to the ground in which the annual convention is
being held. The profile of the arch follows the equation y = 2x − 0.1x2 where y is the height of
the arch in meters. The maximum possible height of the arch is
Answer : Option AExplaination / Solution:
If matrix B is obtained from matrix A by replacing the 1th row by itself plus k times the mth row, for 1 ≠ m then det(B)=det(A). With this property given matrix is equal to the matrices
given in options (B),(C) and (D).
Q7.Suppose p is number of cars per minute passing through a certain road junction between 5
PM and 6PM, and p has a Poisson distribution with mean 3. What is the probability of
observing fewer than 3 cars during any given minute in this interval?
Q9.Out of all the 2-digit integers between 1 and 100, a 2-digit number has to be selected at
random. What is the probability that the selected number is not divisible by 7?
Answer : Option DExplaination / Solution:
The number of 2 digit multiples of 7 = 13